ICALEPCS 2009
TUP090
The Status of the Alba Controls
D.Fernandez-Carreiras* (CELLS-ALBA Synchrotron)
After the commissioning of the Linac and Transfer Line, Alba is installing the booster and beamlines. Commissioning of the booster is scheduled in October 2009. This paper shows the status of the installation of the different subsystems ans well as the software applications and tools for commissioning and operation.